  • 装修实验室前应工程调查把握以下几个方面!
    来源:http://www.jnyhrs.com 浏览: 发布日期:2021-06-22
    装修实验室工程调查的主要目的是什么? 作为客户如何与调查合作? 以下是实验室技术员的介绍。 实验室整改工程调查应把握以下几个方面:
    What is the main purpose of decoration laboratory engineering investigation? How to cooperate with investigation as a customer? The following is the introduction of the laboratory technician. The investigation of laboratory rectification project should grasp the following aspects:
    1、施工单位应尽可能提供场地的总体平面图,分层图和实验室图,并应具有准确的尺寸,立面图和土建图的分层建筑物的高度。 根据民用建筑图纸,设计人员可以了解建筑物空间结构的方向和具体位置,通风和电缆设置以及其他相关设备的安装。
    1. The construction unit shall provide the general plan, layered drawing and laboratory drawing of the site as far as possible, and shall have accurate dimensions, elevation drawing and height of layered building in civil engineering drawing. According to the civil building drawings, designers can understand the direction and specific location of the building space structure, ventilation and cable settings, as well as the installation of other related equipment.
    2、感受现场建筑物与室内空间的空间比例和空间关系,检查现场与甲方提供的建筑图纸之间是否有不一致之处。如果发现现场与建筑图纸之间存在差异,请记录或变更及时。 了解建筑空间的承重结构,以免在设计中损坏承重构件。 注意施工设备,管道和接口的位置是否会影响设计创意的发展。 应注意结构“梁”和其他在建筑图纸中容易被忽略且不容易找到的组件,它们是否在现场存在,是否存在以及它们的大小会影响空间的高度和空间 设计的形象。
    2. Feel the spatial proportion and spatial relationship between the site building and the indoor space, and check whether there is any inconsistency between the site and the architectural drawings provided by Party A. If there is any difference between the site and the architectural drawing, please record or change it in time. Understand the load-bearing structure of the building space, so as to avoid damaging the load-bearing components in the design. Pay attention to whether the location of construction equipment, pipelines and interfaces will affect the development of design creativity. It should be noted that structural "beams" and other components that are easily ignored and not easy to find in architectural drawings, whether they exist on site, whether they exist and their size will affect the height of the space and the image of the space design.
                                 实验室装修
    3、在现场调查并记录组合关系和关键零部件的尺寸。 工程项目的现场规模测量主要包括长度和宽度(间隔和深度),地板高度,横梁,门,窗,柱和管道的尺寸和位置。
    3. Investigate and record assembly relationship and dimensions of key parts on site. The site scale measurement of the project mainly includes the length and width (spacing and depth), floor height, size and location of beams, doors, windows, columns and pipes.
    尺度测量的方法:测量尺寸一般从总门开始,一个房间一个房间地按次序进行。平面尺寸的测量一般是在距地1-1.3m的距离,每测量完一个尺寸就记录在绘制的平面框架草图上,由于土建施工的原因一般会造成工地现场每个面的尺寸有误差。当测量卫生间等场所的时候要多加注意一些管道、设施和设备的安装位置,例如:座便器的坑口位置、给排水的管道位置、水表和气表等的安装位置等,要把这些设备的位置在图样上详细地、准确地记录下来。
    The method of scale measurement: the measurement is generally started from the main door, one room by one in order. The measurement of plane dimension is generally 1-1.3m away from the ground, and each dimension is recorded in the plane frame sketch drawn after measurement. Due to civil construction, there are errors in the dimension of each surface on the construction site. When measuring the toilet and other places, we should pay more attention to the installation position of some pipes, facilities and equipment, such as the pit position of toilet, the position of water supply and drainage pipes, the installation position of water meter and gas meter, etc., and record the position of these equipment in detail and accurately on the drawing.
    当平面的尺寸测量完毕后,仔细地检查一下标有各个测量尺寸的平面草图,看看是否还有疏漏的地方。检查完毕后,开始测量垂直方向的尺寸,如果工程现场的顶部情况不是很复杂,一般只要记录一些简单的数据就可以了,如房间的净高、梁底的高和宽、窗高和门高等数据。当工程现场情况较复杂时,还须绘制立面的草图和顶棚的草图,帮助记录这些复杂情况和在平面上不能反映的尺寸。
    When the dimension of the plane is measured, carefully check the plane sketch marked with each measurement dimension to see if there are any omissions. After the inspection, start to measure the vertical dimension. If the top of the project site is not very complicated, it is generally enough to record some simple data, such as the clear height of the room, the height and width of the beam bottom, the height of the window and the height of the door. When the site conditions of the project are complicated, the elevation sketch and ceiling sketch must be drawn to help record these complicated conditions and the dimensions that cannot be reflected on the plane.