  • 无尘室实验室装修施工装修要注意什么?
    来源:http://www.jnyhrs.com 浏览: 发布日期:2021-10-11
    1.在无尘室装修建筑装饰施工过程中,要随时清扫灰尘,对隐蔽空间,还应做好清扫记录。
    1. During the construction of clean room decoration and building decoration, the dust shall be cleaned at any time, and the cleaning records shall be made for the concealed space.
    2.密封胶嵌固前,应将基槽内的杂质,油污剔除干净,并保持表面干燥。
    2. Before the sealant is embedded, the impurities and oil stains in the foundation groove shall be removed, and the surface shall be kept dry.
    3.对已安装高.效过滤器的房间,不得进行有粉尘的作业。
    3. The room with high-efficiency filter shall not be operated with dust.
    4.施工现场应保证良好的通风和照明,对于改建工程,应查明和切断原有电源及易燃,易爆和有毒气体管线后方可施工,对工艺生产过程中使用的腐蚀性液体应有安全防护措施。
    4. Good ventilation and lighting shall be ensured at the construction site. For reconstruction projects, the original power supply and flammable, explosive and toxic gas pipelines shall be found out and cut off before construction. Safety protection measures shall be taken for corrosive liquids used in process production.
    无菌室装修
    5.应保护已完成的装饰工程表面,不得因撞击、敲打、踩踏,多水作业等造成板材凹陷,暗裂和表面装饰的污染。
    5. The surface of the completed decoration works shall be protected from depression, dark crack and surface decoration pollution caused by impact, knocking, trampling and multi water operation.
    6.无尘室装修建筑装饰工程要与各工种间制定严格的施工程序,一般依次为:留洞打底,各安装,内门窗安装,修补洞口及周边,基层打底,饰面抹灰和罩面板工程,嵌缝处理,油漆刷浆工程和裱糊工程。
    6. Strict construction procedures shall be formulated for clean room decoration and architectural decoration works with various professional types of work, generally in the following order: reserved hole priming, installation of various disciplines, installation of internal doors and windows, repair of holes and surroundings, base course priming, finishing plastering and cover panel works, caulking treatment, paint brushing and pasting works.
    7.无尘室临时设置的设备入口不用时应封闭,防止尘土杂物进入。
    7. The equipment entrance temporarily set in the dust-free room shall be closed when not in use to prevent dust and sundries from entering.
    8.塑料板材和卷材面层铺贴前应预先按规格大小,厚薄分类,板材或卷材与地面之间应满涂粘接剂,表面赶平,不得漏涂或残存空气。
    8. Before paving the surface layer of plastic plate and coil, it shall be classified according to the size and thickness in advance. The plate or coil shall be fully coated with adhesive between the plate or coil and the ground, and the surface shall be leveled without missing coating or residual air.
    以上的精彩内容来自:无菌室装修更多的精彩内容请点击进入我们的网站:http://www.jnyhrs.com,我们后续会有更多的内容为您呈现.