  • 实验室屋顶装修有哪些注意事项?
    来源:http://www.jnyhrs.com 浏览: 发布日期:2019-09-02
      实验室屋顶通常会使用装饰吊顶板,材料选择需要美观大方,颜色色调,符合设计要求,坚实可靠,我们铝扣板吊顶,例如,方便你更好的了解实验室的屋顶装饰的要求,选择铝扣板天花吊顶的主要原因是操作简单,维修方便,可方便地拆下钢板进行更换和维修。
      Laboratory roofs usually use decorative ceiling, material selection needs to be beautiful and generous, color tone, in line with the design requirements, solid and reliable, our aluminium fastener ceiling, for example, to facilitate you to better understand the requirements of laboratory roof decoration, the main reason for choosing aluminium fastener ceiling is simple operation, easy maintenance, easy removal. The steel plate is replaced and repaired.
      实验室装修前的准备工作
      Preparations for laboratory roof decoration
      (1)在天花板上安装各种管道和设备,确定灯具、通风口和各种照明朝向的位置。
      (1) Install various pipes and equipment on the ceiling to determine the orientation of lamps, vents and various lighting.
      (2)安装顶棚盖板前,应先完成墙面及地面湿法施工。
      (2) Before installing roof cover, wet construction of wall and ground should be completed.
      (3)搭建屋面施工平台框架。
      (3) Build the frame of roof construction platform.
      (4)轻钢框架天花大面积施工前,应制作样板房,对天花拱度、灯槽、通风口等部位进行结构处理,经鉴定后进行大面积施工。
      (4) Before large-scale construction of light steel frame ceiling, a model room should be made to deal with the structure of ceiling arch, lamp groove, ventilation outlet and other parts. After identification, large-scale construction should be carried out.
      铝扣板天花板图片
      Photo of Aluminum Button Ceiling
      实验室顶棚装修施工工艺
      Construction technology of laboratory roof decoration
      基础弹簧线→安装吊杆→主龙骨安装→侧龙骨安装→二次龙骨安装→铝扣板安装→清洗完毕→分项验收。
      Foundation spring line installation suspender main keel installation side keel installation secondary keel installation Aluminum fastener installation cleaning completion sub-item acceptance.
      实验室屋顶装修施工细节
      Construction details of laboratory roof decoration
      (1)弹跳线:根据楼层标高标高线,按设计标高,将吊顶标高线绕墙弹跳,找出房间中心点,在墙上以房间中心点为中心画龙骨级配位置线。
      (1) Bulletline: According to the floor elevation line, according to the design elevation, the ceiling elevation line bounces around the wall to find the center of the room and draw keel gradation line on the wall with the center of the room.
    实验室装修
      (2)主龙骨吊杆安装:确定吊杆下端标高,在吊杆触及天花板标高线和龙骨位置线后,安装预制吊杆,吊杆安装用8个膨胀螺栓固定在屋顶上。井架选用8圆钢,吊杆间距控制在1200mm以内。
      (2) Installation of main keel hanger: Determine the lower end elevation of the hanger. After the hanger touches the ceiling elevation line and keel position line, the prefabricated hanger is installed. The installation of the hanger is fixed on the roof with eight expansion bolts. The derrick is made of 8 round steel, and the spacing of suspenders is controlled within 1200 mm.
      (3)安装主龙骨:主龙骨一般选用C38轻钢龙骨,间距控制在1200mm以内。安装时用主龙骨支撑部件与吊杆连接。
      (3) Installation of main keel: C38 light steel keel is generally selected as the main keel, and the spacing is controlled within 1200 mm. The main keel supporting part is connected with the hanger rod during installation.
      (4)侧龙骨安装:用水泥钉将25×25mm的龙骨按房间净高要求绕墙固定,水泥钉间距不得大于300mm。
      (4) Side keel installation: 25 x 25 mm keel is fixed around the wall according to the room net height requirement with cement nails, and the distance between cement nails shall not be greater than 300 mm.
      (5)二次龙骨安装:根据铝扣板的规格尺寸,安装与之配套的二次龙骨,通过悬挂将二次龙骨挂在主龙骨上。下龙骨长度需要多根延续收纳时,用下龙骨连接件挂在吊顶的同时,将对端相连接,先调整直后固定。
      (5) Secondary keel installation: According to the specifications and sizes of the aluminium clasp plate, the secondary keel matched with it is installed, and the secondary keel is hung on the main keel by suspension. When the length of the lower keel needs more than one continuous collection, the lower keel connector is used to hang on the ceiling, while the end is connected, first adjusting the straight and then fixing.
      (6)金属板安装:铝扣板安装时,在装配区域中部垂直于二次龙骨方向拉基准线,并对基准线进行对齐,使基准线安装在两侧。安装时,取放轻,必须沿翻边处轻轻按方板两侧,卡入龙骨后再推合。
      (6) Metal plate installation: Aluminum clasp plate installation, in the middle of the assembly area perpendicular to the secondary keel direction pull the datum line, and align the datum line, so that the datum line is installed on both sides. When installing, take and release the light, you must press the sides of the square plate along the flanging place gently, clip into the keel and push it back.
      (7)清洗:铝扣板安装完毕后,用抹布将板彻底擦拭干净,无任何污垢或指纹。
      (7) Cleaning: After the installation of the aluminum button plate, wipe the plate thoroughly with a rag, without any dirt or fingerprints.
      (8)铝扣板吊顶允许偏差及检验方法
      (8) Allowable deviation and inspection method of aluminium fastener ceiling