    一、成立专门工作组织机构。相关部门指定专门管理人员或相应工程师参加,承担实验室装修改造安全的责任。专门工作组织机构应注意以下几点:
    1、 Establish a special work organization. Relevant departments shall appoint special management personnel or corresponding professional engineers to participate and take the first responsibility for the safety of laboratory decoration and transformation. Special work organizations should pay attention to the following points:
    1、工程论证。在实验室装修改造之前,应对工程项目的必要性、合理性进行充分论证。注意不要因价格而忽视了施工单位相应资质、图纸设计合理性、施工组织合理性、施工材料质量及安全性能等关键因素。
    1. Engineering demonstration. Before the renovation of the laboratory, the necessity and rationality of the project shall be fully demonstrated. Pay attention not to ignore the key factors such as the corresponding qualification of the construction unit, the rationality of drawing design, the rationality of construction organization, the quality of construction materials and safety and environmental protection performance due to the price.
    2、工程审批。用户对实验室装修改造提交的设计方案中所涉及到的本部门负责的工程内容提出意见,在施工单位对设计图纸进行修改完善后予以签字审批,以确保工程质量和安全。
    空气净化工程
    2. Project approval. The user shall put forward opinions on the project contents in the charge of the department involved in the design scheme submitted by the laboratory decoration and transformation, and sign for approval after the construction unit modifies and improves the design drawings, so as to ensure the project quality and safety.
    3、施工管理。施工前应根据材料计划表并配合工程进度表确定材料设备的品种、数量及进场时间。材料堆放位置应事先安排,堆放地点宜集中,切勿任意堆置以致影响工期和材料管理的严密性。这里应注意不得影响正在施工的部位、准备进行施工的部位,避免反复搬迁,损材费工;选择较高的地势堆放;分类堆码,便于取用;易燃、易爆物品分开地点堆放,以保安全;易碎、易潮、易污的材料,应注意堆放方法和采取保护措施以免造成损耗;即用的材料,进场时应直接放置在工作面,以便节省搬运的工序;切实做好进场材料的签收工作,核对材料是否与原设计相符,并按材料的品种、数量进行登记,以备查验。施工过程的管理以工程项目负责人为主,涉及技术性的问题征求相关部门的意见。
    3. Construction management. Before construction, the variety, quantity and mobilization time of materials and equipment shall be determined according to the material schedule and in cooperation with the project schedule. The stacking position of materials shall be arranged in advance, and the stacking place shall be centralized. Do not stack arbitrarily, which will affect the construction period and the tightness of material management. Here, attention shall be paid not to affect the parts under construction and the parts ready for construction, so as to avoid repeated relocation, material damage and labor cost; Select high terrain for stacking; Sort and stack for easy access; Inflammables and explosives shall be stacked in separate places to ensure safety; For fragile, damp and dirty materials, attention shall be paid to the stacking method and protective measures shall be taken to avoid loss; Ready to use materials shall be directly placed on the working face when entering the site, so as to save the handling process; Sign for incoming materials, check whether the materials are consistent with the original design, and register according to the variety and quantity of materials for inspection. The management of the construction process is dominated by the project leader, and the opinions of relevant departments are sought for technical problems.
    4、工程验收。在工程竣工后组织进行整体验收,应注意建筑结构、暖通、通风、给排水、强电、弱电(网络、通讯、监控、防雷、电器设备接地)、消防(烟感报警、喷淋、防火门)、装饰等方面。
    4. Project acceptance. Organize the overall acceptance after the completion of the project, and pay attention to building structure, HVAC, ventilation, water supply and drainage, strong current, weak current (network, communication, monitoring, lightning protection, electrical equipment grounding), fire protection (smoke alarm, sprinkler, fire door), decoration, etc.